What to Expect During a Roof Replacement: A Homeowner’s Guide

Replacing your roof is one of the most significant investments you can make in your home. Whether your current roof is damaged, aged, or you’re upgrading materials, knowing what to expect can make the process smoother and less stressful. Here’s a step-by-step breakdown of what happens during a typical roof replacement.

1. Initial Inspection and Estimate

Before anything begins, a roofing professional will inspect your roof. They’ll assess its current condition, measure the square footage, check for underlying damage, and discuss material options. You’ll receive a detailed estimate outlining:

  • The scope of work

  • Timeline

  • Materials to be used

  • Total cost

Tip: Ask questions and get everything in writing.

2. Scheduling and Preparation

Once you accept the estimate and sign a contract, the project is scheduled. Before the crew arrives:

  • Clear your driveway to allow room for trucks and materials.

  • Move outdoor furniture, grills, and planters away from the home’s perimeter.

  • Protect valuables in the attic, as debris may fall through during removal.

3. Delivery of Materials

Roofing materials (shingles, underlayment, flashing, etc.) are typically delivered 1–2 days before work begins. These will be stored on-site, often on your driveway or yard, so plan accordingly.

4. Removing the Old Roof

On day one of installation, the crew will begin stripping off the existing roofing material down to the decking. This step can be noisy and messy, but it’s critical for ensuring a solid foundation for your new roof.

Important: Most reputable contractors will tarp your landscaping and install protective barriers to minimize mess.

5. Deck Inspection and Repairs

Once the old materials are removed, the roof decking (the wood base) is inspected. If any wood is rotted or damaged, it will be replaced to ensure your new roof lasts.

6. Installing the New Roof

The new roofing system is installed in layers:

  • Ice and water shield (especially around eaves and valleys)

  • Underlayment for waterproofing

  • New shingles or roofing material

  • Flashing and vents

  • Ridge cap and ventilation systems

This process typically takes 1–3 days, depending on the size and complexity of the roof.

7. Cleanup and Final Inspection

After installation:

  • Debris is cleaned up thoroughly

  • Nails are picked up with magnets

  • Your property is returned to its original condition

Finally, a supervisor or project manager will perform a final inspection to ensure everything was installed correctly and meets building codes.

8. Warranty and Documentation

Once complete, you should receive:

  • Warranty information (materials and labor)

  • Maintenance tips

  • Final invoice or receipt

Keep all paperwork in a safe place in case you need it for future home sales or repairs.

Conclusion

Replacing your roof doesn’t have to be overwhelming. By understanding each phase of the process, you can feel confident that your investment is well-protected. If you have questions or want to schedule a free estimate, contact Pinnacle Roofing today — we’re here to help you every step of the way.